Top Picture - The Minecraft Base Bottom Picture - SAS 22 Credenhill Hereford Base New Base is now underconstructionK5000 payed, now time for the fun bits. The base for the SPS is now ready, designs will hopefully be done by Pastel Designs. And people who offered loans now to be payed back. We still have a long way to go for the base but it is possible. I'd like to thank everyone for their support.
0 Comments
|
Group |